MRT SBK Line 1

Client : GAMUDA MGKT

METHODOLOGY

One of the job scope done for this project is drilling holes and preparing injection packer staggered along the leaking points, sealing of the leakage at tunnel segment with low-viscosity and injected grout and subsequently patch surface crack points and removal of packer.

Once the injection has solidified , all injection packers are removed, injection holes are sealed, depending on the construction depth. Any unnecessary or unsightly sealing material is removed. 

Machinery Used   : WIWA 2K-Injekt 14025 

Chemical Used     : MC-Injekt GL-95 & GL-95TX 

                                : NCL-DH ACRYLIC SEAL (DH-50)

Working at height : Platform Ladder (Caged)

Job done for the tunnel track bed injection is drilling hole and preparing injection packer at 100mm – 300mm spacing staggered along the crack lines, injected grout and subsequently patch surface crack line and removal of packer.

Machinery Used   : NCL DHP-M1000

Chemical Used     : NCL-PU FLEX 2